Visual to Show project stageGate
- 8 years ago
Hi
Thanks for all the help, however I managed to find a way to match my picture.
For those who may have a similar issue, this is how I did it:
- Download the Advance card from the store
- Create a compiled "If" formula in the pivot table to convert the stage wording into numbers i.e. =if(project status = "Feasibility",1,if(......... I named this new field "Project Status Number"
- Create an advanced card for each stage and shape it with the show stroke formater
- Add project stage number to the condition field only
- Colour all 4 backgrounds grey
- Set the 1st card to represent the first stage, condition format to: "No. of Conditions" = 1; "If value is" "=", "Value" = "1" then background is pink
- Repeat 6 for the other project stages
- Then, as you cant wordwrap in the cards, I overlayed a text box with the names of the stages.
Then just organise it how you like. This was how it turned out
Thanks
Matt
Matt22365,
How about you create a a Matrix visual and configure conditional formatting in the Matrix? There is a similar thread for your reference.
https://community.powerbi.com/t5/Desktop/Displaying-project-status/td-p/132911
Regards,
Lydia
Hi
Thanks for your response. I have a similar visual for hs showing finish variance which works really well and gets great feedback
However, the graphic I am after for this is more of a flow chart than a heat map. Maybe there may be a way to conditional format shapes rather than a table/matrix
Thanks
Matt