pvarley, umerqadir, the Timeline Slicer control should work correct in the latest version. Please go to Visuals Gallery to get it.
Thanks Vicky.
pvarley, umerqadir, the issue you reported was confirmed by engineer in the 'Custom Visual' team. Thanks for reporting it. I will keep posting here once I get any further updates.
- Vicky_Song10 years agoImpactful Individual
pvarley, umerqadir, the Timeline Slicer control should work correct in the latest version. Please go to Visuals Gallery to get it.
- jude_expedio10 years agoFrequent Visitor
Hi, I am using this latest Timeline slicer (Timeline1.3.1.pbiviz) in a report with Other Slicers and each time I change selection on the other slicers the Timeline is resetting to full range again. This is only a recent problem for me, and downloading the latest Timeline has not fixed the problem. The timeline slicer is not interactively linked and should hold the date range I have piced. Thanks for your help
- elsiered10 years agoFrequent Visitor
Experiencing same issue here
- elxinside10 years agoFrequent Visitor
Hi, I've tried the latest version,1.3.1, with latest version of power bi desktop and I still have the same issue!
- Abduvali9 years agoSkilled Sharer
Hi,
I have downloaded the latest version which is Timeline.1.3.21.0 version but it still doesn't work properly:
1. Picture one is with slider selecting May 2017 gives me 22.5 days available (which is incorrect
2. Picture two I'm using the standard slicer and selecting May 2017 which returns the correct value of 2.5 days
Please advice
Thank you
- umerqadir10 years agoFrequent Visitor
Awesome! Great turnaround time in getting this fixed!
- jamesaaa10 years agoRegular Visitor
Hi all!
The original issue is still reproducible in version 1.3.1, here is the scenario:
1) Select a couple of days in the timeline slicer.
2) Click/double click on a column in the Stacked Column Chart/Clustered Column Chart
Result: the couple of days selection is now turned into all days selection in the timeline slicer, even if I remove interactions between these visuals
This is really bothering some business people I communicate with and it would be wonderfull if a fix can be provided for this ASAP.
Let me know if you need any help with reproducing this.
Thanks, James
- MiguelSaldana779 years agoResolver I
I have the same problems with timeline, this is not displaying the correct days of the week