Forum Discussion
TimeChart in PowerBI? Is it possible?
- 5 years ago
Here's what I ended up doing.
I changed the time calculation to a decimal. So 90 seconds becomes 1.5 minutes. 220 seconds becomes 3.67 s, etc.
Then I plotted the "minutes" as a decimal on the Y-axis. This worked. The value to it as well was that for multiple charts on the same report, I could control the y-axis more easily by just setting the lower and upper bounds by number.
Thanks for your help!
Here's what I ended up doing.
I changed the time calculation to a decimal. So 90 seconds becomes 1.5 minutes. 220 seconds becomes 3.67 s, etc.
Then I plotted the "minutes" as a decimal on the Y-axis. This worked. The value to it as well was that for multiple charts on the same report, I could control the y-axis more easily by just setting the lower and upper bounds by number.
Thanks for your help!