Forum Discussion
spandy34
3 years agoResponsive Resident
Time Duration
I am struggling with measuring time a duration. I have a calculated column called Planned Duration - which is short time format. I have included the column code below. Can you please tell me ho...
spandy34
3 years agoResponsive Resident
The day is the same because the planned visit should be 23:30 and leave the visit at 00:00. The day would change if the exist time was 00:01. The data is a SQL import from a Care System.
The Planned Duration (highlighted yellow) should say 00:30 instead of 23:30 . The Planned Entry Time Date and Planned Exist Time Date are from an SQL Import . I need to create a column for time format and digital format for the Planned Duration (Planned Exist Time Date -Planned Entry Time Date) but when the entry time is near midnight the calculations go wrong.
Im sorry if I was unclear.