Hi all,

 

I trying to build a OEE loss Tree in powerbi but I'm archieving the result that i want.
I need to place in a stacked graph the lower part the result of OEE measure, after that the Availability losses segregated by it categories, and after that the Rate loss that is another measurement. The problem is that I not able to place the availability loss in the legend if i place it in the stacked graph with the other measures. Can anyone have any tip for me?

Thanks for you help!

 

 

2 Replies

  • Anonymous , Based on what I got, Create a measure for all of them, Create a calculation group, and manually add a group column in that(Add new column and group measures). Use Group on axis, Calculation group as legend and any measure as value (Y-axis)

    • Anonymous's avatar
      Anonymous
      Not applicable

      Hi amitchandak ! Thanks for your help! When do you say create a calculation group, what this means? Can you give me a example of this in Dax?