I need to plot a scatter chart using the following columns:
1.Columns (Sum of Drilled interval (m) (x),Sum of Dry hole days (y),well) for plotting X ,Y Axis and the Wells.
2.Columns (Ordered x-values,P25 y-values,P50 y-values) for plotting the curves as shown below.
Please Note:
The first row of the below table shows the respective columns.
And "Ordered x values" are the 10 equally-spaced values.
Sum of Drilled interval (m) (x),Sum of Dry hole days (y),well,_calclogy,Index,RegressionY,Actualy/Regressiony,_index,CalculatedColumn,Ordered x-values,Ordered y,P50 y-values,trial_values,P25 y-values