Forum Discussion
JimJim
Responsive Resident
3 years agoRolling 3 month drill through
Hi Guys,
Here's a link to a simple report: https://1drv.ms/u/s!ArazqhFmvkSJlmVxJRRpSR1dAG4m?e=6N59oL
The report has rolling 3 months measures, I would like to drill through to the details page and be shown data for all 3 months. Is this possible?
JimJim , A measure can not control the date axis in drill down visual
2 Replies
- amitchandak
Super User
JimJim , A measure can not control the date axis in drill down visual
- JimJim
Responsive Resident
Thank you for confirming