Resources Occupancy Day by Day calculation

Hello,

 

I have a table with my projects, starttime endtime and occupancy (%) of the resource in charge of each one of them.

I have a table with all my staff used by a column in the projects table.

 

I would like to see the sum per day of the occupancy (all projects assigned, considering start&end time) of each resource in a table with on the left the list of all my resorces and the rest a timeline eplained day by day with the sum of the occupancy value.

 

Better if i can add a timeline slicer that show me a specific time and calculate baed on the choice of the period and not all data in one time.

 

How can i do this ?

 

Thank you!

 

 