Hi,
Why are you creating a DAX table? Why are you not solving it with a measure? Do you have a Date column? If you are OK with a measure solution and have a Date column, then share the download link of the PBI file.
I did try a measure initially but had trouble geting a reduction by week to be illustrated in a visual. There is a date column in the table with containing the expense data. (I have a calendar table that is connected to the dates in the expense table.) There is not a date column in the table containing the project data (budget). Here is the measure I tried
- Ashish_Mathur2 years ago
Super User
As requested earlier, share some data to work with and show the expected result.
- ColetonC2 years agoRegular Visitor
Here is the result I am looking for
I have a PowerBI file I can now share but I am not able to share in this reply. What is the best way to share the PBIX file?
- Ashish_Mathur2 years ago
Super User
Upload the file to Google Drive/One Drive and share the download link.