Forum Discussion
Problems with power bi using a Sybase database
Anonymous I guess you are using in-built sybase connector. I think working with MS support would be your best option as if there is any bug only they can get it fixed. You can also post it to the ideas section as bug and based on number of votes it receive you can get it prioritised. I would also suggest meanwhile you use odbc drive for sybase and connect that way and test out if that results in any issues.
- Eric_Zhang10 years agoMicrosoft Employee
Anonymous
Are you talking about the scheduled refresh in Power BI Service? If yes, what does the refresh history say? Do you encounter the same error when the ODBC source is pointing to a SQL Server?
- Anonymous10 years agoNot applicable
the log that is entered is not readable, are just codes, the same mistake does not happen when I connect to an sql
- Eric_Zhang10 years agoMicrosoft Employee
Anonymous wrote:
the log that is entered is not readable, are just codes, the same mistake does not happen when I connect to an sql
Anonymous
Do you mean the problem doesn't occur when using an ODBC source connecting to SQL Server? As you've said that you are using an ODBC source connecting to Sybase. Just put the two databases into the same scenario to eliminate the possibility from db side.