Share feedback directly with Fabric product managers, participate in targeted research studies and influence the Fabric roadmap.
Sign up nowGet Fabric certified for FREE! Don't miss your chance! Learn more
How to update the Power BI next schedule refresh date in Power BI report.
some body please help me on this
Solved! Go to Solution.
You can either add a static text box with "this report refreshes every x days/hours/etc. or you can get the last refresh datetime and add the scheduled refresh interval to it in a measure (e.g., + 2 hrs).
Add last refresh date to a Power BI report - Azure DevOps | Microsoft Docs
Pat
To learn more about Power BI, follow me on Twitter or subscribe on YouTube.
Hi y'all,
Just wanted drop this one here, where I wrote a blog article on how to expose the next schedule refresh date/time in a Power BI report. It uses the get-refresh-schedule REST API to load in the schedule data and calculates the next scheduled refresh with a measure:
https://www.tackytech.blog/how-to-get-the-next-scheduled-refresh-date-into-your-power-bi-report/
Hope this helps 🙂
/Tom
https://www.tackytech.blog/
https://www.instagram.com/tackytechtom/
| Did I answer your question❓➡️ Please, mark my post as a solution ✔️ |
| Also happily accepting Kudos 🙂 |
| Feel free to connect with me on LinkedIn! | |
| #proudtobeasuperuser | |
You can either add a static text box with "this report refreshes every x days/hours/etc. or you can get the last refresh datetime and add the scheduled refresh interval to it in a measure (e.g., + 2 hrs).
Add last refresh date to a Power BI report - Azure DevOps | Microsoft Docs
Pat
To learn more about Power BI, follow me on Twitter or subscribe on YouTube.
If you love stickers, then you will definitely want to check out our Community Sticker Challenge!
Check out the January 2026 Power BI update to learn about new features.
| User | Count |
|---|---|
| 64 | |
| 63 | |
| 48 | |
| 21 | |
| 18 |
| User | Count |
|---|---|
| 118 | |
| 117 | |
| 38 | |
| 36 | |
| 27 |