Forum Discussion
Phasing calculation or forecasting calculation with planned data
- 5 years ago
Hi, DianaZ
I am not sure why Q4 2022 planned reduction is 450 (400 ???), but please check the below picture and the sample pbix file's link down below.
All measures are in the sample pbix file, and all steps are numbered in front of each measure.
https://www.dropbox.com/s/9u9tb7uml9jfavx/dianaz.pbix?dl=0
Hi, My name is Jihwan Kim.
If this post helps, then please consider accept it as the solution to help other members find it faster, and give a big thumbs up.
Hi, DianaZ
I am not sure why Q4 2022 planned reduction is 450 (400 ???), but please check the below picture and the sample pbix file's link down below.
All measures are in the sample pbix file, and all steps are numbered in front of each measure.
https://www.dropbox.com/s/9u9tb7uml9jfavx/dianaz.pbix?dl=0
Hi, My name is Jihwan Kim.
If this post helps, then please consider accept it as the solution to help other members find it faster, and give a big thumbs up.