Permanent date labels for Gantt Chart / timeline visualisation?
The top is the expected mockup in powerpoint and the bottom is the current visualisation I've made in power BI.
Currently, the milestone name and date only appears as a tooltip when viewers mouse over the milestone. I want them to be displayed as permanent text on top of the milestone labels like in the mockup. How would I do this?
I am using Gantt 2.2.3 by Microsoft. I can use other add-ins if needed.
2 Replies
- amitchandak
Super User
Anonymous , See if these have some option you are looking for
https://xviz.com/visuals/gantt-chart/
https://powerbi.microsoft.com/en-us/blog/visual-awesomeness-unlocked-gantt-chart/
https://www.mpug.com/articles/how-to-create-an-amazing-gantt-chart-in-power-bi/
- AnonymousNot applicable
Thanks, I'll look into them and report back what I find.
If anyone has a Gantt 2.2.3 solution or even a vanilla power BI "hack" using cards or whatever do let us know as well!