Forum Discussion
On calculated field, using the date hierarchy causes an error.
- 10 years ago
It is funny - some observations ... was able to show the the hierarchy for calucated date after doig the following 2 actions.
a) Set the calculated date field to Date/Time
b) saved the pbix file.
then used the calcualted field in a visual....
I'm on Version: 2.34.4372.322 64-bit (April, 2016)
Hierarchy showing up for Date3Logic for the Calculated Date Field
Thanks for trying, sornavoor! It almost feels like it is getting caught in some type of circular reference, though not sure why, nor if that makes sense. But when the formatting matches and types match, I can't guess what would make it fail!
It is funny - some observations ... was able to show the the hierarchy for calucated date after doig the following 2 actions.
a) Set the calculated date field to Date/Time
b) saved the pbix file.
then used the calcualted field in a visual....
I'm on Version: 2.34.4372.322 64-bit (April, 2016)
Hierarchy showing up for Date3Logic for the Calculated Date Field