Join us at FabCon Atlanta from March 16 - 20, 2026, for the ultimate Fabric, Power BI, AI and SQL community-led event. Save $200 with code FABCOMM.
Register now!Get Fabric Certified for FREE during Fabric Data Days. Don't miss your chance! Request now
Hi,
I've got the table below, and the orange header are my main data inside Power BI and the green headers are the first initial calculation.
Calcualtion I need to do in Power is:
W.F = Each Duration / Overall Duration of each project (Sum of durations)
W.F Per day = W.F / Duration
And then I want the "W.F per day" to be spread within the duration of each row, which give you the table below:
Which will give you the graphs below from the comulatives.
These are all on excel and I want this inside power BI please.
Can someone pelase help. Thank you!
The data table below for ease of use.
| Project ID | Start | Finish | Duration |
| A | 07/04/2025 | 09/04/2025 | 3 |
| A | 10/04/2025 | 21/04/2025 | 8 |
| A | 22/04/2025 | 28/04/2025 | 5 |
| A | 29/04/2025 | 30/04/2025 | 2 |
| B | 15/04/2025 | 18/04/2025 | 4 |
| B | 21/04/2025 | 25/04/2025 | 5 |
| B | 28/04/2025 | 30/04/2025 | 3 |
| B | 01/05/2025 | 02/05/2025 | 2 |
Solved! Go to Solution.
Your Duration column is not helping. Instead, use a filter that eliminates saturdays and sundays.
Check out the November 2025 Power BI update to learn about new features.
Advance your Data & AI career with 50 days of live learning, contests, hands-on challenges, study groups & certifications and more!