All,

 

I am trying to make a visualization identical to the one I have already built below using only built-in PowerBI visualizations. The one below is built with the non-Microsoft Multiplie Axis Chart v3.0.1 by xViz, which requires a subscription. So I cannot use that one.

 

Problem:
- Actual duration (one column) on the left y-axis

- AFE duration (another column) on the right y-axis

- Phase along the x-axis (a third column)

- Legend / color by Op Code (a fourth column)

 

With the build-in visualizations in PowerBi, I am able to get the total values for each bar (9.25, 8.56, 6.48, 4.81 etc.), but unable to color by/legend for each separate bar.

 

Any help would be appreciated.

Thanks!

 

1 Reply

  • You can consider trying your hand at the Deneb visual.  The learning curve is a bit steep but it offers the flexibilty your requirement demands.