The ultimate Fabric, Power BI, SQL, and AI community-led learning event. Save €200 with code FABCOMM.
Get registeredEnhance your career with this limited time 50% discount on Fabric and Power BI exams. Ends September 15. Request your voucher.
Hey there
I would like to modify the distance between y-axis labels in a line chart. The chart shows Date on the x-axis and Revenue on the y-axis.
Right now it's showing the labels 0.5 Mio. and 1.0 Mio. Max/Min is set to Auto. However I would like to have smaller steps (0.25 Mio. per label). Is that possible in PBI? In Excel it's no problem.
Thx George
Solved! Go to Solution.
Hi @GeorgeXXVII ,
The steps between axis values are not configurable on PBI, depending on the size of the visualization you will get mor or less detail but there is no way to set them individually like in excel.
Regards
Miguel Félix
Proud to be a Super User!
Check out my blog: Power BI em PortuguêsHi @GeorgeXXVII ,
The steps between axis values are not configurable on PBI, depending on the size of the visualization you will get mor or less detail but there is no way to set them individually like in excel.
Regards
Miguel Félix
Proud to be a Super User!
Check out my blog: Power BI em Português