Forum Discussion
MicroStrategy to Power BI migration process
Hi All,
I am migrating Micristaratagy reports to power Bi
while convert metric used in Microstratagy and i am unable to write in power BI measure
In Microstaratagy they calucaled Geo Stop count = Count(GeoStopNumber) with including curley bracket.
Curly bracket they called it level metric or level demention.
can you please help me how to write same thing in Power BI
Please find the more about level metric in MSTR for your reference;
2 Replies
- amitchandakSuper User
Anonymous , Not very clear, but seem like LOD of tableau
How to do that in power bi
LOD- FIXED (Level of Details) - Revisited: https://youtu.be/hU-cVOwDCvY
LOD Include (Level Of Details): https://youtu.be/nmBVc2fN6aU
LOD exclude (Level of Details): https://youtu.be/wJEjG3O3vrk
- AnonymousNot applicable
In Microstratagy they have used like above. they called it has level dimentionality.
i want to convert above meric into power BI
all columns are coming from one table except calendar_Dt
if you refer below link you may it helps to undersandCan you please help to resove this issue