Measure from two tables
GarnseyG , you should able to join both tables on task and should able to calculate.
For more help Can you share sample data and sample output.
- GarnseyG6 years agoHelper I
Not sure how to share my pbix file, or for that matter how to attach anything
- GarnseyG6 years agoHelper I
If this helps: Here is some sample data as an example
Task Table:
Task Project Window a p1 12 b p1 20 c p1 15 d p2 35 e p2 42 f p3 18 g p3 8 h p3 23 i p3 21 j p4 14
People table
Person Task LastDateWorked 1 a 5/9/2020 1 b 4/24/2020 1 c 5/3/2020 1 d 5/9/2020 1 e 5/7/2020 2 f 4/24/2020 2 g 5/4/2020 2 h 4/29/2020 2 i 5/18/2020 2 j 5/19/2020 3 a 5/4/2020 3 b 5/9/2020 4 c 5/9/2020 4 d 4/21/2020 4 e 5/18/2020 4 f 5/10/2020 4 g 5/7/2020 5 h 4/21/2020 5 i 5/5/2020 5 j 5/11/2020 So for task "A" with a 12 day window. Using 5/18/2020 as today, 12 days ago is 5/6. Person 1 worked 5/9 so he/she is inside the window (good) while person 3 is outside the window (Bad). Two people work, one good, so 50% for that task.
I would use the same logic when doing it by project, or doing it by person.
- Greg_Deckler6 years agoCommunity Champion
2 tables, 1 measure...
So, you might have some luck looking at Open Tickets. It's designed to deal with date intervals. https://community.powerbi.com/t5/Quick-Measures-Gallery/Open-Tickets/m-p/409364#M147
Please see this post regarding How to Get Your Question Answered Quickly: https://community.powerbi.com/t5/Community-Blog/How-to-Get-Your-Question-Answered-Quickly/ba-p/38490
The most important parts are:
1. Sample data as text, use the table tool in the editing bar
2. Expected output from sample data
3. Explanation in words of how to get from 1. to 2.