The ultimate Fabric, Power BI, SQL, and AI community-led learning event. Save €200 with code FABCOMM.
Get registeredCompete to become Power BI Data Viz World Champion! First round ends August 18th. Get started.
I am sure i am doing something very basically wrong!!!
I have a PowerBI model (simplified) to show the issue - here
The issue i have is that i have a table with loads of P70 values (in Table 1)
I have written a measure to find the Max P70 for each line
The other table has values in it, and each value needs to be multiplied by the max P70 value......
I have written a measure to do it, which works, but i am not getting the totals at the bottom of the Matrix table - and i cannot work out why!!!!
Can anyone help please??
sorry, but i am not that good with this, and the video does not help me! 😞
@TimK , if you row context, if or Time intelligenece, then you can issue with grand total,
Refer this https://www.youtube.com/watch?v=ufHOOLdi_jk
User | Count |
---|---|
80 | |
78 | |
37 | |
34 | |
31 |
User | Count |
---|---|
93 | |
81 | |
60 | |
49 | |
49 |