I currently have a table of rental equipment and a list of contracts they were assigned to with dates. My goal is to create a visual that will give me a breakdown of equipment type, the number of units, the number of days avaialbe across all units, and the number of days assigned to contracts across all units within any given date window. Here is my sample pbix.

 

This is my sample semantic model:

Days Available = 
VAR add_date = 
    SELECTEDVALUE(Units[AddDate])
VAR min_date = 
    MIN('Calendar'[Date])
VAR start_date = 
    IF( add_date > min_date, add_date, min_date)
VAR end_date = 
    CALCULATE(
        MAX('Calendar'[Date]), 
        'Calendar'[Date] <= TODAY(), 
        KEEPFILTERS('Calendar')
    )
VAR available_dates = 
    DATESBETWEEN('Calendar'[Date], start_date, end_date)
RETURN
    COUNTROWS(available_dates)
Days Assigned = 
VAR add_date = 
    SELECTEDVALUE(Units[AddDate])
VAR min_date = 
    MIN('Calendar'[Date])
VAR start_date = 
    IF( add_date > min_date, add_date, min_date)
VAR end_date = 
    CALCULATE(
        MAX('Calendar'[Date]), 
        'Calendar'[Date] <= TODAY(), 
        KEEPFILTERS('Calendar')
    )
VAR available_dates = 
    DATESBETWEEN('Calendar'[Date], start_date, end_date)
VAR contract_dates = 
    DATESBETWEEN('Calendar'[Date], SELECTEDVALUE('Lease Contracts'[StartDate]), SELECTEDVALUE('Lease Contracts'[EndDate]))
VAR dates_joined = 
    NATURALINNERJOIN(available_dates, contract_dates)
RETURN
    COUNTROWS(dates_joined)

 

I've managed to create two unaggregated visuals. One for days available and one for days assigned. However, the measures used to calculate those values require UnitID and ContractID respectively to be accurate. That means they do not work when aggregated by EquipmentType. 

 

 

This is the general idea of my target visual:

 

I'm not sure if I need some separate measure that aggregates the first two or if I need to rework the entire approach. I've considered calculated columns, but as far as I know they would not change values based on a date filter/slicer. 

  • Hi again B_Rax 

    Thank you Anonymous for you alternative solution.
    I am not sure it produces the answers B_Rax  wants.

    It very complicated for novices like B_Rax  to learn.
    It contains lots of branches in SWITCH statements, which will each need rigorously testing.
    And it is difficult to change if the user decides they want to exclude weekends and holidays.

    I therefore respectfully suggest this PBIX solution which you can download from Onedrive
    Click here 

     

    How it works ...

     

    Use a detached Calendar table with contiguous dates for your slicer date window 

     

    Create a "slave" measure to calculate days avaialble

     

    _Days available = 
    // this measure must be used a XSUMX wrapper
    
    // get the unit add date
    var unitstart = SELECTEDVALUE(Units[AddDate])
    
    // create a temp file of dates using the date slicer window and add date
    var mydays =
    FILTER('Calendar',
        'Calendar'[Date] > unitstart
    )
    RETURN
    // count the number of dates
    COUNTROWS(mydays)
    

     

     

     

    Then a "master" measure to iterarte the slave for each unit in your reporting context (eg contracts, units or equipment type)

     

    Days available = 
    // this measure uses the SUMX function to iterate the calcuation for any unit  
    var daysavailabe =
    SUMX(
        Units,
        [_Days available]
    )
    RETURN
    // avaiability can only be measured at unit or type level but not contract level
    IF(ISINSCOPE(Contracts[ContractID]),
    BLANK(),
    daysavailabe)

     

     

    Create a "slave" measure to calculate days on contract

     

    _Days on contract = 
    // this measure must be used a XSUMX wrapper
    
    // get the contract date range
    var contractstart = SELECTEDVALUE(Contracts[StartDate])
    var contractend = SELECTEDVALUE(Contracts[EndDate])
    
    // create a temp file of dates using the date slicer window and contract date
    var mydays =
    FILTER('Calendar',
        'Calendar'[Date] >= contractstart &&    
        'Calendar'[Date] <= contractend
    )
    RETURN
    // count the number of dates
    COUNTROWS(mydays)
    

     

     

    Then a "master" measure to iterarte the slave for each unit in your reporting context.

     

    Days on contract = 
    // this measure uses the SUMX function to iterate the calcuation for any contract
    
    SUMX(
        Contracts,
        [_Days on contract]
    )

     

     

    When you run the the report at equipment type level then the totals roll up automatically 

     

    Page 1 shows the inner workings with the "slaves".

    Page 2 shows the final reports with just the "masters" and without the "slaves"
    Note all dates are in UK dd/mm/yyyy format but you can display them in USA mm/dd/yyyyy 

     

    For example there were 366 days in 2020 (leap year) but Unit 4 was added on 9Jan.
    So it was available 366 - 9 = 357
    It had a contract for 6 days.
    Usage was 6 / 357 = 1.68%

     

     

    If you change the date slicer window to 12/01/2020 to 31/12/2020
    then the availability and days in contract changes accordingly

    This method is easy to understand and learn, and easy to test because  it does not have lots of switch branches.

    If you just want to include working days and exclude weekends and holidays then you could add a working days column to the Calendar table, and aggregate that rather than count rows. 

     

    Please click thumbs up for this suggestion (because I did spend a lot of time on it)
    and also click [accept solution] if it works.

    Hope it helps and makes up for our rocky start. 👍

     

    Warm regards, 😀

     

     

     

15 Replies

  • Hi again B_Rax 

    Thank you Anonymous for you alternative solution.
    I am not sure it produces the answers B_Rax  wants.

    It very complicated for novices like B_Rax  to learn.
    It contains lots of branches in SWITCH statements, which will each need rigorously testing.
    And it is difficult to change if the user decides they want to exclude weekends and holidays.

    I therefore respectfully suggest this PBIX solution which you can download from Onedrive
    Click here 

     

    How it works ...

     

    Use a detached Calendar table with contiguous dates for your slicer date window 

     

    Create a "slave" measure to calculate days avaialble

     

    _Days available = 
    // this measure must be used a XSUMX wrapper
    
    // get the unit add date
    var unitstart = SELECTEDVALUE(Units[AddDate])
    
    // create a temp file of dates using the date slicer window and add date
    var mydays =
    FILTER('Calendar',
        'Calendar'[Date] > unitstart
    )
    RETURN
    // count the number of dates
    COUNTROWS(mydays)
    

     

     

     

    Then a "master" measure to iterarte the slave for each unit in your reporting context (eg contracts, units or equipment type)

     

    Days available = 
    // this measure uses the SUMX function to iterate the calcuation for any unit  
    var daysavailabe =
    SUMX(
        Units,
        [_Days available]
    )
    RETURN
    // avaiability can only be measured at unit or type level but not contract level
    IF(ISINSCOPE(Contracts[ContractID]),
    BLANK(),
    daysavailabe)

     

     

    Create a "slave" measure to calculate days on contract

     

    _Days on contract = 
    // this measure must be used a XSUMX wrapper
    
    // get the contract date range
    var contractstart = SELECTEDVALUE(Contracts[StartDate])
    var contractend = SELECTEDVALUE(Contracts[EndDate])
    
    // create a temp file of dates using the date slicer window and contract date
    var mydays =
    FILTER('Calendar',
        'Calendar'[Date] >= contractstart &&    
        'Calendar'[Date] <= contractend
    )
    RETURN
    // count the number of dates
    COUNTROWS(mydays)
    

     

     

    Then a "master" measure to iterarte the slave for each unit in your reporting context.

     

    Days on contract = 
    // this measure uses the SUMX function to iterate the calcuation for any contract
    
    SUMX(
        Contracts,
        [_Days on contract]
    )

     

     

    When you run the the report at equipment type level then the totals roll up automatically 

     

    Page 1 shows the inner workings with the "slaves".

    Page 2 shows the final reports with just the "masters" and without the "slaves"
    Note all dates are in UK dd/mm/yyyy format but you can display them in USA mm/dd/yyyyy 

     

    For example there were 366 days in 2020 (leap year) but Unit 4 was added on 9Jan.
    So it was available 366 - 9 = 357
    It had a contract for 6 days.
    Usage was 6 / 357 = 1.68%

     

     

    If you change the date slicer window to 12/01/2020 to 31/12/2020
    then the availability and days in contract changes accordingly

    This method is easy to understand and learn, and easy to test because  it does not have lots of switch branches.

    If you just want to include working days and exclude weekends and holidays then you could add a working days column to the Calendar table, and aggregate that rather than count rows. 

     

    Please click thumbs up for this suggestion (because I did spend a lot of time on it)
    and also click [accept solution] if it works.

    Hope it helps and makes up for our rocky start. 👍

     

    Warm regards, 😀

     

     

     

    • B_Rax's avatar
      B_Rax
      Helper I

      I've been busy on other things, but got some time to review this solution. I believe it will work for my report. Thank you for the assistance. The helper measures for SUMX was the step I had not considered. 

  • We want to help you but your description is too vague. 

    Please DON'T copy & paste your DAX that does not work and expect us to fathom what you want to do. That is a bit crazy. 😀

    Please just give a simple non technical functional description of what you want, then let us suggest the solution. Thank you.

    Provide example input data as table text (not a screen print) so we can import the data to build a solution for you.

    Remove any unneeded columns which may cause confusion.   
    (In your description you have devoted 75% of text to proudly explaining whay you have got work and only 25% to the actual problem, which clouds and confusses the issue).

    Rename columns to user friendly names. Avoid jargon.
    Also provide the example desired output, with a clear step-by-step description of calculations the process flow.
    Remember not to share private data ... we don't want you to get into trouble. 😧
    Take time and care to use the same table and field names in the input, output and description so we can understand your problem and help you.
    Try keep it simple and ask one question per ticket.
    You will get a quick response if you put time, care and effort into writing clear problem descriptions.
    Remember you are gertting free expert help, so please put lots of proper effort to asking questions and providing examples.

    Vaugue descriptions can waste your time and our time.

    Look forward to helping you when the above information is forthcoming 😀

    • B_Rax's avatar
      B_Rax
      Helper I

      Respectfully, I did describe my goal and issues. I linked a simple pbix example of what I'm working with. The dax I linked does work. The next step is what I need help with. "Vaugue descriptions can waste your time and our time." This was far from vague and a time waste. Please be specific in what more information you would like if you are interested in helping. Thank you.

  • Look forward to helping you when the above information is forthcoming.
    Perhaps another member will help you with what you have provided.
    I apprecaite it must be frustrating you cant do your can't do your job,

    but rememeber we unpaid volunteers who just want to help.

    👍

     

     

     

     

     

     

    • B_Rax's avatar
      B_Rax
      Helper I

      From your first post you have been hostile to me. And now you are blatantly insulting me. I'm sorry if you're having a bad day. I appreciate your attempt to provide assitance, but would suggest if you tell others to be diligent and spend time crafting the perfect post that you also spend time actually reading and understanding that post. Also, I recommend proofreading your responses as they read very unprofessionally (even for an unpaid volunteer). Again, thank you.

  • I had a great day thank you and solved other members issues.
    If you provide the information requested I will be happy to help you.

    Otherwise I hope another Super User helps you.

    Perhaps ask a freind, collegaue or manager to see if they can help you reword your description. 

    Remember, we do want to help now and in the future 😀

     

     

     

    • B_Rax's avatar
      B_Rax
      Helper I

      Again, the information you requested is in the original post and provided example pbix. However, I'll attempt to highlight the main points and provide tables here if you are unable to view the example file. The measures involved are in the original post.

       

      I have two tables (plus a date table):

      • Lease Contracts - table of contracts including the relevant unit and the start/end dates of the contract period.
      • Units - table of units in inventory, their equpment type, and the date in which they were added.

       

      Goal:
      Create a visual that shows for any date context:

      • Each equipment type
      • Number of days that type has been available to be on contracts across all units
      • Number of days that type has been on contract across all units
      • Ratio between available and assigned (utilization).

      Process:

      I have three measures:

      • Days Availabe - Calculates the number of days a unit was avaiable to be on contracts.
      • Days Assigned - Calculates the number of days a unit was actually on contracts.
      • Utilization - Divdes days assigned by days available.

      These measures work, but not for the target visual that aggregates by equipment type. Therefore, I either need a different approach to these calculations or to add additional steps.

      Lease Contracts

      ContractIDUnitIDStartDateEndDate
      1101/01/202001/03/2020
      2101/04/202001/04/2020
      3201/01/202001/02/2020
      4301/10/202001/15/2020
      5301/16/202001/20/2020
      6302/01/202002/05/2020
      7502/02/202002/04/2020
      8401/10/202001/15/2020
      9101/06/202001/08/2020
      10101/09/202001/12/2020

       

      Units

      UnitIDAddDateEquipmentType
      101/01/2020Truck
      201/01/2020Truck
      301/05/2020Trailer
      401/09/2020Trailer
      502/02/2020Truck

       

      Example Desired Result for 1/1/2020 - 1/20/2020

      EquipmentTypeUnit CountDays AvailableDays AssignedUtilization
      Trailer2281760.7%
      Truck2401332.5%

       

      If this continues to be unclear, please be specific in what you need. Thank you.

  • Thanks. Much appreciated !
    I am trying to build some of the measure now, 
    but it it is getting late here. So might be tomorrow.
    Good night👍

    • B_Rax's avatar
      B_Rax
      Helper I

      Sleep well and sweet dreams.

  • B_Rax 
    Download this PBIX example solution from Onedrive
    Click here 

     

    So far I hace only created 1 measure. I will try do the other tomorrow.
    Note I have used UK date formats

    How it works  ...

    Add a detached calendar table with contigous dates for the entire date range.


    Note the date window changes contract 5 from 5 to 3 days, and all te unit and type totals

     

     

    Hope this helps  ?

  • Anonymous's avatar
    Anonymous
    Not applicable

    Hi B_Rax ,
    You can try the following steps:

    First create a date table

     

    Date = 
    VAR startDate = 
    SWITCH(
        TRUE(),
        MIN('Lease Contracts'[StartDate]) <= MIN('Lease Contracts'[EndDate]) && MIN('Lease Contracts'[StartDate]) <= MIN(Units[AddDate]), MIN('Lease Contracts'[StartDate]),
        MIN('Lease Contracts'[EndDate]) <= MIN('Lease Contracts'[StartDate]) && MIN('Lease Contracts'[EndDate]) <= MIN(Units[AddDate]), MIN('Lease Contracts'[EndDate]),
        MIN(Units[AddDate])
    )
    VAR endDate = 
    SWITCH(
        TRUE(),
        MAX('Lease Contracts'[StartDate]) >= MAX('Lease Contracts'[EndDate]) && MAX('Lease Contracts'[StartDate]) >= MAX(Units[AddDate]), MAX('Lease Contracts'[StartDate]),
        MAX('Lease Contracts'[EndDate]) >= MAX('Lease Contracts'[StartDate]) && MAX('Lease Contracts'[EndDate]) >= MAX(Units[AddDate]), MAX('Lease Contracts'[EndDate]),
        MAX(Units[AddDate])
    )
    RETURN
    CALENDAR(startDate,endDate)

     

    Second, Create mesures

     

    Unit Count = 
    CALCULATE(
        DISTINCTCOUNT('Lease Contracts'[UnitID]),
        FILTER(
            'Lease Contracts',
            'Lease Contracts'[StartDate] >= MIN('Date'[Date]) &&
            'Lease Contracts'[EndDate] <= MAX('Date'[Date])
        )
    )
    AvailableDays = 
    DATEDIFF(
        MIN('Lease Contracts'[StartDate]),
        MAX('Lease Contracts'[EndDate]),DAY)
    + 2
    Days Assigned = 
    VAR addDate = 
    CALCULATE(
        COUNTROWS('Lease Contracts'),
        FILTER(
            ALLEXCEPT(
                'Lease Contracts',
                Units[EquipmentType]
            ),
            'Lease Contracts'[StartDate] >= MIN('Date'[Date]) &&
            'Lease Contracts'[EndDate] <= MAX('Date'[Date])
        )
    )
    RETURN
    CALCULATE(
        SUMX(
            'Lease Contracts',
            DATEDIFF('Lease Contracts'[StartDate],'Lease Contracts'[EndDate],DAY)
        ),
        FILTER(
            'Lease Contracts',
            'Lease Contracts'[StartDate] >= MIN('Date'[Date]) &&
            'Lease Contracts'[EndDate] <= MAX('Date'[Date])
        )
    ) + addDate
    Utilization = DIVIDE([Days Assigned],[AvailableDays],0)

     

    Final output

     

    Best regards,
    Albert He


    If this post helps, then please consider Accept it as the solution to help the other members find it more quickly

     

  • B_Rax 
    Have you any feedback on the solution yet?

    I am avaialable for a little longer today and then really busy Friday, ans then we go into the weekend.

    So hope we can concluded any Q&As today, to get you a quick answer.

  • Hi agaib B_Rax 

    We haven't received any feedback from you regarding the solution.

    But I recall how quickly you responded vigorously when promoted for example data 🤔
    If we dont here from you, then the solution will be accepted after a period,

    but we would like to hear how you got on.

    Thank you for using the community forum ! 👍

  • Thanks B_Rax 

    Hope to help you again in future.

    It really helps if you attach data as text rather than screen print. Cheers.