Forum Discussion
How To create Distribution Chart(Bell chart) in Power BI
- 5 years ago
Hi Anonymous
For the color legend, you could split the line into 3 lines. Create measures for 3 Risk score separately and put all of them into Values. Then format them with different colors and turn on shade area.
f(x) High = IF('Normal Distribution'[X]<FLOOR([x-2],1)||'Normal Distribution'[X]>FLOOR([x+2],1),[f(x)],BLANK())
f(x) Medium = IF(('Normal Distribution'[X]>FLOOR([x-2],1)&&'Normal Distribution'[X]<FLOOR([x-1],1))||('Normal Distribution'[X]>FLOOR([x+1],1)&&'Normal Distribution'[X]<FLOOR([x+2],1)),[f(x)],BLANK())
f(x) Low = IF('Normal Distribution'[X]>FLOOR([x-1],1)&&'Normal Distribution'[X]<FLOOR([x+1],1),[f(x)],BLANK())
For the count of Part number shown in Y axis, I don't know how to deal with it. Sorry.
Regards,
Community Support Team _ Jing
If this post helps, please Accept it as the solution to help other members find it. - 5 years ago
Hi Anonymous
All of f(x) High / Medium / Low measures should be placed in the Line values rather than Column values. You can remove the original f(x) measure from Line values to check the result. They should connect then. Let me know if it works or not.
Regards,
Jing
- 5 years ago
Hi Anonymous
You should move them to Line values area below.
Jing
- 5 years ago
Hi Anonymous
Seems close, we need to do some formattings further.
- Under X axis, change Type from Continuous to Categorical.
- Right click on the X field in Shared axis and select Show items with no data option.
- On the chart, click ... and select Sort by X and Sort ascending.
And in the formulas, change all > and < signs to >= and <= to connect the boundry values.
Jing
Hi Anonymous
You should move them to Line values area below.
Jing
Hi Jing,
Is this correct?
- v-jingzhang5 years agoCommunity Support
Hi Anonymous
Seems close, we need to do some formattings further.
- Under X axis, change Type from Continuous to Categorical.
- Right click on the X field in Shared axis and select Show items with no data option.
- On the chart, click ... and select Sort by X and Sort ascending.
And in the formulas, change all > and < signs to >= and <= to connect the boundry values.
Jing
- Anonymous5 years agoNot applicable
Hi Jing,
you are awesome 🙂 fnally i got the view but is there any way to do the same chart with Variance % & Count of Parts as shown below.
- v-jingzhang5 years agoCommunity Support
You can consider creating measures to get the Variance % & Count of Parts, and put them in multi-row card visuals.
Power BI Data Visualization Best Practices Part 6: Multi-Row Cards (instructorbrandon.com)