I created a Project dimension table and added 1:m relationships to the 3 main tables.
I made the existing relationships between fact tables inactive ( I would probably delete them but I left that for you to do if required).
I've changed the measure on the first table to be a little simpler but you'll need to check the impact on the rest of the report.
I would advise creating your own Dates table and using that instead of the built-in date features (entirely up to you).
It also looks like the CoW productivity table is really a slowly changing dimension so you might want to do something with this (I didn't investigate too much because I wanted to do the simplest thing that works to fix the initial posted question).
I'll send the pbix thru the internal mail system.
Let me know how it goes.
can you post/link your pbix please?
I want to see the model relationships, also I think your first 2 measures can be simplified but it will depend on what the model looks like.