Forum Discussion
Help with a 'complicated' measure
hi, timknox
It seems that the link is the loss, I'm sorry what I am confused about is that in the bottom table (Paid Date) for Item 1.1, there is only 3 rows of data and how to understand "Example is with Item 1.1 - you will see that orriginally on the 1/11/18 20% of the cost was withheld; 10% was then released on teh 1/12/18; and 10% was released on 1/1/19."
For your case, I think it is a "merge" or "lookup" case.
You can upload it to OneDrive and post the link here. Do mask sensitive data before uploading.
Best Regards,
Lin
- v-lili6-msft7 years agoCommunity Support
HI, timknox
This link works, and the same point confused.
EXAMPLE FOR CONTRACT ITEM 1.1 - 20% that was withheld on 1/11/18; 10% was paid on 1/12/18 and 10% was paid on 1/1/19
EXAMPLE FOR CONTRACT ITEM 1.1 - 30% that was withheld on 1/12/18; 30% was paid on 1/1/19
EXAMPLE FOR CONTRACT ITEM 1.2 - 20% that was withheld on 1/10/18; 20% was paid on 1/12/18For example
Do you mean it is based on the Percentage Cost Withold (Paid) table,
But why 1.3 has no data, and for 1.1 TOTAL Paid in 1/1/2019 is should 222+23.3+136.8-0=382.1
and 1.2 TOTAL Paid in 1/1/2019 is should 273.95, why it needs to add 136.80?
Best Regards,
Lin
- timknox7 years agoHelper II
hi Lin,
I am sorry i am not explaining it clearly, but thank you for your help.
So the underlying cost data is contained in the Excel file tblFOO. This show in the [col Total Cost] what should be paid for each [Contract Item] on the [Date].
However, due to contract reasons, a % is sometimes withheld until some work is completed.
This is measured as a % of the original [col Total Cost].
This is demonstrated in the sheet [Percentage Cost Withhold]. NOTE: we do not withhold for every payment or contract item.
So as an example, with Contract Item 1.1, on the 1st Nov 2018 we have decided to withhold 20% of the [col Total Cost] until work is completed. This value is 20% of 233.00 (46.60). So on the 1/11/18 we actually pay only 186.400 (233.00 - 46.60).
Then, using [Percentage Cost Withold (Paid)] you will see that on the 1st Dec 2018 they had completed some of the work, and they were claiming half of the 20% withheld (shown as 10% in the table).
So on 1/12/2018 we will then pay half of the value that was withheld in November - i.e. we pay 23.30 on the 1/12/18.
Similarly in January they claim the balance, so we pay the final 23.30 in January 2019.
Does that help?
- timknox7 years agoHelper II
But why 1.3 has no data, >>>>> i just did not do the example :-)
and for 1.1 TOTAL Paid in 1/1/2019 is should 222+23.3+136.8-0=382.1 >>>>>> Correct - sorry
and 1.2 TOTAL Paid in 1/1/2019 is should 273.95, why it needs to add 136.80? >>>>>> Correct - sorry
- timknox7 years agoHelper II
i have updated the file [Output Required]
https://www.dropbox.com/s/8rizb42cqku62mh/OutPut%20Required.xlsx?dl=0