Forum Discussion

trondott's avatar
trondott
Regular Visitor
10 years ago

Generalized line diagram

Hi all!

I have a problem getting full resolution of measurements in a line diagram when I use a code to split series. The first figure shows a summarized (sum of 2 measurements) line diagram which looks fine with values for each hour. However, when I split into individual series, I only get values every 8 hours, as shown in figure 2.

Capture1.JPG

Capture2.JPG

 

Anyone have an idea how I can get full resolution in the second diagram?

1 Reply

  • It looks like the values for the 2 seperate lines might be so small that they don't really show up well.  Try doing this with 2 seperate graphs, and see if the lines appear seperately, on their own scale.  If they look good seperate, and not together, then you know it is a Scale issue with your y axis.