Forum Discussion
trondott
10 years agoRegular Visitor
Generalized line diagram
Hi all!
I have a problem getting full resolution of measurements in a line diagram when I use a code to split series. The first figure shows a summarized (sum of 2 measurements) line diagram which looks fine with values for each hour. However, when I split into individual series, I only get values every 8 hours, as shown in figure 2.
Anyone have an idea how I can get full resolution in the second diagram?
1 Reply
- NhallquistHelper V
It looks like the values for the 2 seperate lines might be so small that they don't really show up well. Try doing this with 2 seperate graphs, and see if the lines appear seperately, on their own scale. If they look good seperate, and not together, then you know it is a Scale issue with your y axis.