Forum Discussion
Error Power BI - Incremental Refresh - Timeout
Hi Anonymous ,
Scheduled refresh timeout
Scheduled refresh for imported datasets timeout after two hours. This timeout is increased to five hours for datasets in Premium workspaces. If you encounter this limit, consider reducing the size or complexity of your dataset, or consider breaking the dataset into smaller pieces.
https://docs.microsoft.com/en-us/power-bi/refresh-troubleshooting-refresh-scenarios
- Anonymous6 years agoNot applicable
Hi mwegener ,
I reduced the dataset to test the incremental refresh. But it stopped less than 2 hours with the same error.
On request 8/5/2020, 13:37:14 - 8/5/2020, 14:21:38
Failed An error occurred while processing the data
{"Error": {"code": "DM_GWPipeline_Gateway_TimeoutError", "pbi.error": {"code": "DM_GWPipeline_Gateway_TimeoutError", "parameters": {}, "Details": [], "exceptionCulprit": 1}} }
I am testing the refresh action on power BI online , not scheduled refresh action.
maybe it doesn't depend on the subscription
Thanks
- mwegener6 years agoMost Valuable Professional
Hi Anonymous ,
take a look at this.
https://community.powerbi.com/t5/Service/DM-GWPipeline-Gateway-TimeoutError/m-p/1029967
- Anonymous6 years agoNot applicable
Hi mwegener ,
the link is a solution for SQL Server DB Connection.
the Incremental Refresh doesn't works for ODBC Connection with HANA because Folding Query is not available but only for HANA connector.