Forum Discussion
Dynamic Percent change while filtering
Hi Dear All,
I have one challenge... I have 3 Project Location columns and 1 value columns in pwer Bi. I want to see percentage in Card chart and it should be link with locations. means i select location or its sub location so it show me cumulative percentage of that selected location only.
The below Picture shows the 100% when i Select Construction in left corner of the sheed which is OK.
But when i select the location it shows me the breakdown percentage, however I want to see of that selected location as whole out of 100%.
Below is the Power QUery
can someone help me out?
5 Replies
- PaulDBrownCommunity Champion
Please share non-confidential actual data (not an image) and a depiction of the expected outcome
- nedian_bilalFrequent Visitor
Dear Mr. PaulDBrown
send me your email address.. here i am unable to attach PBI file- PaulDBrownCommunity Champion
The best way to share a file is to share the link from a cloud service such as One Drive, Google Drive, Dropbox, Wetransfer...
What is the % calculation?
- nedian_bilalFrequent Visitor
- nedian_bilalFrequent Visitor
Example
below is the example sheet. The card percentage should show the overall percentage if i select Construction, and under construction, if i select locations like 3rd River or GIFT then it should not show percentage 30% for 3rd River and 70% for Gift.. it should be transformed into 100%.Activity ID Activity Name BL Start BL Finish Forecast Start Forecast Finish WTG WBS_Code_1 WBS_Code_2 WBS_Code_3 A001 A 17-Feb-22 31-May-22 20-Sep-22 6-Oct-22 10.00% Construction 3rd River Water Intake Facilities Civil A002 B 1-Jun-22 28-Sep-22 4-Dec-22 12-Jan-23 8.00% Construction 3rd River Water Intake Facilities Mech A003 C 2-Jun-22 22-Jun-22 17-May-22 5-Oct-22 12.00% Construction 3rd River Water Intake Facilities Electrical A004 D 22-Jun-22 19-Jul-22 9-Mar-23 5-Apr-23 13.00% Construction GIFT Area Civil A005 E 23-Jun-22 9-Dec-22 27-Feb-23 12-May-23 7.00% Construction GIFT Area Mech A006 F 27-Jul-22 21-Feb-23 13-Jan-23 8-Mar-23 5.00% Construction GIFT Area Electrical A007 G 22-Feb-23 14-Mar-23 13-May-23 2-Jun-23 15.00% Construction GIFT Area Instrument A008 H 15-Mar-23 7-Apr-23 3-Jun-23 26-Jun-23 10.00% Construction GIFT Area Structure A009 I 15-Mar-23 29-Mar-23 13-May-23 27-May-23 20.00% Construction GIFT Area ABC A010 J 23-Jun-22 7-Jul-22 20-Oct-22 3-Nov-22 0.00% Commissioning Commissioning Commissioning A011 K 8-Jul-22 12-Jul-22 4-Nov-22 8-Nov-22 0.00% Commissioning Commissioning Commissioning