Forum Discussion
Duration converted to a Date Time Format
- Anonymous4 years ago
I think I figured it out. I have the field in Excel set to General
I import the data
leave it as a Date/Time
I don't transform anything but go to the Data tab in the builder and change the format to be hh:nn:ss
Ignore the 2nd 2 columns I was testing.
It would be nice though if PBI did not convert these types of data. Leave it as is. I can't figure out if that's an option or not...
I think I figured it out. I have the field in Excel set to General
I import the data
leave it as a Date/Time
I don't transform anything but go to the Data tab in the builder and change the format to be hh:nn:ss
Ignore the 2nd 2 columns I was testing.
It would be nice though if PBI did not convert these types of data. Leave it as is. I can't figure out if that's an option or not...