Hi Experts,
If a referenced project ID exists in the table, I want to drillthrough on the referenced project id (in a second report page).
Expected result:
In the report page 2 I want to see the information of the referenced project and not of the original project (row 1 in the table in report page 1).
Current Status: I used the filter 'Referenced project ID' for all visuals in report page 2. But I still get the information of the original project instead of the referenced project.
I believe I have to match 'project ID' and 'Referenced project ID'?
Thank you in advace for your support.
Greetings
I wonder wht solution you built, did you eventually duplicate project table?
@amitchandak Is there a smarter way than replicate the table 1, match the table1[PROJECT ID] with table2[Referenced project ID] and drillthrough on measure = SELECTEDVALUE(table1[Referenced project ID],1)?
Hi, sorry to revive this, have you ever resolved this? If so, mind to share some logic here please? Thank you
@Anonymous , Hop project Id is not in the list of drill through?
refer
Power BI Drill Through - More than one level: https://www.youtube.com/watch?v=hCAAvpppQmk
Hi @amitchandak,
Unfortunately, the video was not helpful as it described how to drill through on a previous drilled through.
On the report page 1, you'll find a table with the 'project id' and the corresponding project details such as 'project name', 'project start and end date', 'cost', 'project stage'. Some projects (rows) have a 'referenced project id'.
On page 2, you should see the project details of the 'referenced project id'. I want to drill through in page 1 by 'referenced project id' to report page 2. In the visual (table with 'project name', 'project start and end date', 'cost', 'project stage') in report page 2 I keep ONLY the filter for 'referenced project id. The project Id is not in the list of drill through in page 2.
Why do I still see the project details of project id instead of referenced project id?
Greets
Hi @amitchandak
Thank you for your fast answer. The project Id is not in the list of drill through in page 2. In the report page 2 (drill through) you can find the 'referenced project ID' and columns like 'project name', 'project start and end date', 'cost', 'project stage'. Unfortunately the values of project id are returned in the drill through page, instead of the corresponding values of 'referenced project ID'.
Share feedback directly with Fabric product managers, participate in targeted research studies and influence the Fabric roadmap.
Check out the February 2026 Power BI update to learn about new features.
| User | Count |
|---|---|
| 50 | |
| 40 | |
| 37 | |
| 14 | |
| 14 |
| User | Count |
|---|---|
| 85 | |
| 69 | |
| 38 | |
| 29 | |
| 27 |