Skip to main content
cancel
Showing results for 
Search instead for 
Did you mean: 

Join us for an expert-led overview of the tools and concepts you'll need to become a Certified Power BI Data Analyst and pass exam PL-300. Register now.

Reply
violet11_6
Frequent Visitor

Drill through waterfall chart

Hi.

 

I have a table as follows

ScenarioCurrencyYearMonthOrg structure Lvl 2Org structure Lvl 3Org structure Lvl 4Value
Actual       
Budget       

 

I had successfully built a waterfall chart that bridge the performance breakdown by [Org Structure Lvl 3] from Budget to Actual when filtering for the selected [Org Structure Lvl 2]. However, I would like to be able to drilldown by the related [Org Structure Lvl 3] to another waterfall chart that bridges the performance breakdown by [Org Structure Lvl 4].

 

I have tried selecting [Org Structure Lvl 3] as [Drill through] when building the detailed waterfall chart report. This, however, did not return the drillthrough feature that I was hoping to see when I returned to the main waterfall chart. 

 

Where could I have gone wrong? 

1 REPLY 1
violet11_6
Frequent Visitor

Hi. Since I'd selected [Values] as y-axis values in my first waterfall chart by [Org Structure Lvl 3] breakdown, I've also tried selecting [values] as the drillthrough field in the second detailed waterfall chart by [Org Structure Lvl 4] breakdown. It still did not work.

 

I tried using org structure hierarchy and it also did not work. Any kind soul able to advise where I've gone wrong? 

Helpful resources

Announcements
Join our Fabric User Panel

Join our Fabric User Panel

This is your chance to engage directly with the engineering team behind Fabric and Power BI. Share your experiences and shape the future.

June 2025 Power BI Update Carousel

Power BI Monthly Update - June 2025

Check out the June 2025 Power BI update to learn about new features.

June 2025 community update carousel

Fabric Community Update - June 2025

Find out what's new and trending in the Fabric community.