Forum Discussion
Drill through waterfall chart
Hi.
I have a table as follows
| Scenario | Currency | Year | Month | Org structure Lvl 2 | Org structure Lvl 3 | Org structure Lvl 4 | Value |
| Actual | |||||||
| Budget |
I had successfully built a waterfall chart that bridge the performance breakdown by [Org Structure Lvl 3] from Budget to Actual when filtering for the selected [Org Structure Lvl 2]. However, I would like to be able to drilldown by the related [Org Structure Lvl 3] to another waterfall chart that bridges the performance breakdown by [Org Structure Lvl 4].
I have tried selecting [Org Structure Lvl 3] as [Drill through] when building the detailed waterfall chart report. This, however, did not return the drillthrough feature that I was hoping to see when I returned to the main waterfall chart.
Where could I have gone wrong?
1 Reply
- violet11_6Frequent Visitor
Hi. Since I'd selected [Values] as y-axis values in my first waterfall chart by [Org Structure Lvl 3] breakdown, I've also tried selecting [values] as the drillthrough field in the second detailed waterfall chart by [Org Structure Lvl 4] breakdown. It still did not work.
I tried using org structure hierarchy and it also did not work. Any kind soul able to advise where I've gone wrong?