Forum Discussion

Anonymous's avatar
Anonymous
Not applicable
6 years ago
Solved

Drill through for Gauge visualization.

Hi,

Is there a way to do drill through for Gauge? Apparently, when I am right-clicking of Guage, it only shows me three option 1: Show as table 2 group and 3 copy visual. But when I can change the Gauge to Table or matrix, it allows me to do drill through for the same data.  Does anyone know a way around to do drill through for guage. ThanksGuage doesn't show drill throughTable shows drill through

  • Anonymous

    There is not because the gauge does not have any categorical fields (color, region, company, etc).  These are the fields you would put on the rows in a matrix visual and these are the fields that drillthrough uses.  If you make a matrix visual and put just your measure on it there you will see the same behavior.

     

    In my example below I added Category as a drillthrough field to page 2.

     

    When category is in the matrix on page 1 I can drillthrough.

     

    If I remove category from the matrix the "target" of my drillthrough is no longer available to read so I cannot drillthrough.

     

     

     

1 Reply

  • Anonymous

    There is not because the gauge does not have any categorical fields (color, region, company, etc).  These are the fields you would put on the rows in a matrix visual and these are the fields that drillthrough uses.  If you make a matrix visual and put just your measure on it there you will see the same behavior.

     

    In my example below I added Category as a drillthrough field to page 2.

     

    When category is in the matrix on page 1 I can drillthrough.

     

    If I remove category from the matrix the "target" of my drillthrough is no longer available to read so I cannot drillthrough.