Hi jb0101
Download PBIX file with example shown below
Donuts aren't the best/right way to show this data. Use a Gauge instead.
I've put a filter on these to only display data for the corresponding project i.e. either A or B. If you have project data in separate tables you won't need to do this.
I've added the name of the project to the visual title. You can remove this and use a card visual if you like.
Regards
Phil
Thanks for the reply from PhilipTreacy and Kedar_Pande.
Hi jb0101 ,
Has your problem been solved, if the replies are helpful to you, please mark them as solutions, if you expect the effect to want to be exactly the same as in the picture, you may need to add two rows to the data source, here's how I did it:
1. Add the following two rows:
2.Take project B for example, select B and 1-B.
3.Clarify the interaction effect between two visuals:
4.The result is as follows:
Best Regards,
Zhu