Hi All,
I have a task that requires me to be able to define the progress of a project. Below is the scenario.
I have a data table with a column that has Project Names in it, and for each project there can be more than one task/ticket associated to it. Each task has a progress complete column with (fake data) that ranges from 0-100. The data looks something like this:
What I am seeking to do is to be able to display a total progress completion percentage for all of the tickets for each project. The percentage should total up to 100%. We have to keep in mind that the number of tasks could easily vary and isn't always the same as the screenshot shows for this sample.
Is there a way to do this using Dax? Id like to display this in a card as well.
Solved! Go to Solution.
@spatialcoder
Measure
Hi,
Share data in a format that can be pasted in an MS Excel file and show the expected result.
The solution below assisted me in the ask.
I will do so in my next post for sure.
@spatialcoder
Measure
This did help alot. I was stuck in the process of sorting the position where this should go.
Ths only other thing I do have as a question is if there is a way to control the percentages it reports?
Right now I have a total reading 0.xx % is there something in the UI to configure that will give me somewthing like 85.0 % instead of 0.85 %?
March 31 - April 2, 2025, in Las Vegas, Nevada. Use code FABINSIDER for a $400 discount!
Check out the February 2025 Power BI update to learn about new features.
User | Count |
---|---|
89 | |
85 | |
67 | |
52 | |
31 |
User | Count |
---|---|
124 | |
114 | |
74 | |
65 | |
46 |