Forum Discussion
Cross-report-drill-through cache problem on the target report
Hi,
I'm not sure if I do something wrong or not. But after I clicked drill-through to the target report as the 2nd time (with different parameter), the target report still shows the results from the 1st time parameter. I have to click Power BI Refresh button to make it shows results from the 2nd time parameter. I can see that the filter value in the Filter pane is the correct value.
Do we really need to hit Refresh button every time to make it shows the right results or I missed something?
Note that I use the back arrow from browser to navigate back to the source report.
Thanks in advance,
W.
5 Replies
- v-frfei-msft
Community Support
Hi Anonymous ,
Based on my test, I cannot reproduce your issue here. Could you please share your sample data to me if you don't have any Confidential Information.Please upload your files to One Drive and share the link here.
- AnonymousNot applicable
Hi Frank v-frfei-msft ,
Thank you for your reply.
From your images, it look likes the drill through is within the same report. Right?
My issue is regarding the new feature released early in April to support drill through to another report in the same workspace.I will try to edit my pbix file and post here again when I’m back to work.
Regards,
W
- AnonymousNot applicable
I´m facing the same issue. I need to keep hitting the refresh button to make the query run. In my case the filters seem to be getting through to the detail report, but the filters are then simply not running automatically. This needs to work without a manual refresh, otherwise this functionality is simply not usable by my end users!
- AnonymousNot applicable
Thanks Anonymous for submitting a ticket for this.
Cheers,
Wanthana