Forum Discussion
Change Tooltip title in Power BI Native Gantt Chart Visual
- Anonymous1 year ago
Hi evek ,
In the native Power BI Gantt chart, the Resource title in the tooltip is fixed and cannot be renamed directly from the visual settings. However, you can completely bypass it using a custom tooltip report page.Steps:
Create a new report page in Power BI Desktop.
In Page Information, turn Tooltip = On and set page size to Tooltip.
Design this page with the fields you want and your own titles.
Open your Gantt chart, then navigate to the Format pane, select Tooltip, and go to Options.
Change Type from Default to Report page.
Select your custom tooltip page from the dropdown.
Now, when you hover over the Gantt visual, only your designed tooltip will appear the default Resource label will no longer be shown.
Hi,
Thanks a lot for the reply 🙂
I am not entirely sure the first two will work? the resource title will still be there.
and for custom tooltip to work, the gantt chart needs to have this option in the visual in order to display a custom tooltip page right?
evek True, we don't have that option on Gantt chart.