Forum Discussion
Anonymous
2 years agoNot applicable
Adding measures to a visual with data from 2 data sources
Hello, I have 2 tables connected 1-1 in both directions, when I add data to a visual table where the connecting key is preasant everything is alright.
But when i add a measure to it, it looks like the connection between those tables becomes inactive:
My first thought was that it was cause of the measure:
But the problem persisits even after changing the measure to very simple one:
I was looking for some solutions online or similar problems but couldnt find anything. Thanks for help in advace.
1 Reply
- AnonymousNot applicable
Hi, Anonymous
What is the data about this problem in your two tables, you can share the tables without sensitive data or pbix file for testing, it will help you to solve the problem faster. Feel free to help you.Best Regards,
Yang
Community Support Team