Hello,

 

I have two AS Timeline visuals to show our plants production schedule. Both timelines are pulling data from the same sheet, however, I have split it into two different visuals to seperate the loaction of the lines. Is it possible to have the two visuals linked, so that, for example, when I click the red bar it will highlight all of them in both visuals. Currently, it is doing what is happening in the second image.

 

1st:

 

 

2nd:

 

 

Thanks in advance!

 

 

  • Hi  Anonymous ,

     

    First make sure that the interactions between the 2 visuals are "Filter":

    Then go to "field">"Behavior">"Multiselect adds to ..",check whether it's on:

    If it is "on",you need to make it off or you need to click triple times to highlight the data that is crossing over the data you select.

    Here is a video.

    https://www.youtube.com/watch?v=1U2_h7FY3ag

     

    Best Regards,
    Kelly
    Did I answer your question? Mark my post as a solution!

     