Power BI is turning 10, and we’re marking the occasion with a special community challenge. Use your creativity to tell a story, uncover trends, or highlight something unexpected.
Get startedJoin us at FabCon Vienna from September 15-18, 2025, for the ultimate Fabric, Power BI, SQL, and AI community-led learning event. Save €200 with code FABCOMM. Get registered
Hi! My team has connected our workspaces to Git.
Currently our experience is that when we create data pipelines, the data pipelines themselves are synced to Git. However, when we equip the pipelines with scheduled runs at specific times, these are not tracked by the source control and are thus not included in the Git branch.
Is this a known limitation, or would it seem like we are doing something wrong? I have not been able to find any documentation describing this limitation, if so.
Hi @vegardbus ,
Thanks for the reply from AndyDDC .
While the data pipeline itself can be synchronized to Git, plan runs are not automatically included in the Git branch. You need to manually manage schedule runs for the pipeline outside of the Git repository.
You can provide feedback on this feature on Home.
Best Regards,
Yang
Community Support Team
If there is any post helps, then please consider Accept it as the solution to help the other members find it more quickly.
If I misunderstand your needs or you still have problems on it, please feel free to let us know. Thanks a lot!
Hi @vegardbus unfortunately there's nothing on the Fabric roadmap
What's new and planned for Data Factory in Microsoft Fabric - Microsoft Fabric | Microsoft Learn
This is your chance to engage directly with the engineering team behind Fabric and Power BI. Share your experiences and shape the future.
Check out the June 2025 Fabric update to learn about new features.
User | Count |
---|---|
4 | |
4 | |
3 | |
2 | |
2 |