The ultimate Fabric, Power BI, SQL, and AI community-led learning event. Save €200 with code FABCOMM.
Get registeredEnhance your career with this limited time 50% discount on Fabric and Power BI exams. Ends August 31st. Request your voucher.
I have a table where the costs go up to march and i want to put it on another graph that has a table that goes on until december. When i put it on the y axis, the line goes all the way through to decmeber, how can i get it to stop at march (the green and orange lines)?
use a measure that returns BLANK() after March.