Power BI is turning 10! Tune in for a special live episode on July 24 with behind-the-scenes stories, product evolution highlights, and a sneak peek at what’s in store for the future.
Save the dateJoin us for an expert-led overview of the tools and concepts you'll need to become a Certified Power BI Data Analyst and pass exam PL-300. Register now.
Hi Community,
When I change a slicer on the page level of a given report I wan't the grap visualization x axisis to follow this, but can't get it to work.
I'm using Azure DevOps (ADO) and their analytics tool - great!
I'm working Scrum like.
But I face some problemes with the visuals in the graphs is changed from a slicer change. The slicer is set to Iteration path.
When I manually try to bind values to the given graph visual, then I have to manually set the to and from date - I didn't find a way to bind these values a column/row in my table.
Do you have a good advise to fix this?
Please let me now if the location of this post is wrong,l so it can be posted in the correct channel 🙂
BR and Merry Christmas
/Michael
Solved! Go to Solution.
I suggest to ask in Desktop thread.
Ignat Vilesov,
Software Engineer
Microsoft Power BI Custom Visuals
I suggest to ask in Desktop thread.
Ignat Vilesov,
Software Engineer
Microsoft Power BI Custom Visuals
Thanks I've moved this to the Desktop tread
Check out the July 2025 Power BI update to learn about new features.
This is your chance to engage directly with the engineering team behind Fabric and Power BI. Share your experiences and shape the future.