<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Connectivity between Control-M and Power BI in Report Server</title>
    <link>https://community.fabric.microsoft.com/t5/Report-Server/Connectivity-between-Control-M-and-Power-BI/m-p/1321343#M15686</link>
    <description>&lt;P&gt;You could probably use a similar approach to the one I outlined here&amp;nbsp;&lt;A href="https://community.powerbi.com/t5/Report-Server/Refresh-Power-BI-using-company-scheduler/m-p/987057" target="_blank"&gt;https://community.powerbi.com/t5/Report-Server/Refresh-Power-BI-using-company-scheduler/m-p/987057&lt;/A&gt;&lt;/P&gt;</description>
    <pubDate>Tue, 25 Aug 2020 04:42:52 GMT</pubDate>
    <dc:creator>d_gosbell</dc:creator>
    <dc:date>2020-08-25T04:42:52Z</dc:date>
    <item>
      <title>Connectivity between Control-M and Power BI</title>
      <link>https://community.fabric.microsoft.com/t5/Report-Server/Connectivity-between-Control-M-and-Power-BI/m-p/1320099#M15681</link>
      <description>&lt;P&gt;Hi All,&lt;/P&gt;&lt;P&gt;Does any one have any idea about connectivity between Control-M and Power BI ?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I want to achive event based scheduling for Power BI Reports(Paginated Reports).&lt;/P&gt;&lt;DIV&gt;We are trying to implement even based scheduling in our project. Currenly , In existing architechture they are using control M for scheduling the crystal reports. Is there any other way ? Can we integrate Control M and Powerbi reports using some API ?&lt;/DIV&gt;&lt;DIV&gt;&amp;nbsp;&lt;/DIV&gt;&lt;DIV&gt;Thanks in advance.&lt;/DIV&gt;&lt;DIV&gt;&amp;nbsp;&lt;/DIV&gt;&lt;DIV&gt;&amp;nbsp;&lt;/DIV&gt;</description>
      <pubDate>Mon, 24 Aug 2020 16:49:18 GMT</pubDate>
      <guid>https://community.fabric.microsoft.com/t5/Report-Server/Connectivity-between-Control-M-and-Power-BI/m-p/1320099#M15681</guid>
      <dc:creator>Anonymous</dc:creator>
      <dc:date>2020-08-24T16:49:18Z</dc:date>
    </item>
    <item>
      <title>Re: Connectivity between Control-M and Power BI</title>
      <link>https://community.fabric.microsoft.com/t5/Report-Server/Connectivity-between-Control-M-and-Power-BI/m-p/1321343#M15686</link>
      <description>&lt;P&gt;You could probably use a similar approach to the one I outlined here&amp;nbsp;&lt;A href="https://community.powerbi.com/t5/Report-Server/Refresh-Power-BI-using-company-scheduler/m-p/987057" target="_blank"&gt;https://community.powerbi.com/t5/Report-Server/Refresh-Power-BI-using-company-scheduler/m-p/987057&lt;/A&gt;&lt;/P&gt;</description>
      <pubDate>Tue, 25 Aug 2020 04:42:52 GMT</pubDate>
      <guid>https://community.fabric.microsoft.com/t5/Report-Server/Connectivity-between-Control-M-and-Power-BI/m-p/1321343#M15686</guid>
      <dc:creator>d_gosbell</dc:creator>
      <dc:date>2020-08-25T04:42:52Z</dc:date>
    </item>
  </channel>
</rss>

