Anonymous
3 years agoNot applicable
Status:
Needs Info
Power BI Git Integration Uncommitted Changed After Syncing
After connecting an existing Fabric/Power BI workspace to Git, selecting the option to have the Git repo overwrite what's in the workspace, and waiting for the sync to complete, an Uncommitted change...
pcavacas
Helper I
3 years agoI'm also experiencing the same issues. The steps that I did was to create an empty workspace. Created a new repo which contained 1 Power BI file saved as a PBIP file. When I sync that repo with the workspace it always comes back with uncommitted changes.
In the definition.pbir file under the .Report folder the following change is present. In the main branch, which came from the Power BI Desktop save it has Access Mode=readonly. When that is synced into the Workspace it removes this section.
"connectionString": "Data Source=\"powerbi://api.powerbi.com/v1.0/myorg/*************\";Initial Catalog=\"Production Model\";Access Mode=readonly;Integrated Security=ClaimsToken",
"connectionString": "Data Source=\"powerbi://api.powerbi.com/v1.0/myorg/*************\";Initial Catalog=\"Production Model\";Integrated Security=ClaimsToken",
Even if I select the change in the Workspace and say to undo the change it always comes back