When building a semantic model that references another the workspace name is used in the connection path.
When the workspace name changes the connection is broken and the path cannot be updated.
Opening in power bi desktop there is no source query to edit.
Request that the semantic model editor use the workspace GUID to build the connection string.
No CommentsBe the first to comment
Recent ideas
Data Pipelines - Run only selected activities
For debugging and testing pipeline activities during development, allow us to select one or multiple activities and run only the selected pipeline activities. For example, I'm working on editing ...frithjof_v1 hour agoCommunity ChampionNew606Views11likes2CommentsSemantic model connection bindings should be in source control (Git)
Semantic model data source connection bindings should be source controlled. A semantic model can contain multiple data source references, each of which can be mapped to a separate Fabric data connec...frithjof_v8 hours agoCommunity ChampionNew12Views1like0CommentsBulk changing column names in Visualizations Pane
We often use raw/api column names or measures with a set nomenclature to be consistent and to keep track of them but we do not want to display these names in the visuals. Currently we have to change ...vishal14019712 hours agoFrequent VisitorNew6Views0likes0Comments