The security model for custom visualizations is too restrictive - users need a way to accept a visualization once only. When I add a custom visualization to a report, PowerBI requires me to enable custom visualizations each time I want to view the report. Worse - if I navigate away from the report and come back to it - I have to re-enable custom visualizations, and any customizations I made to the visualization are lost.
1 Comment
- fbcideas_migusrNew MemberStatus added:Planned
Recent ideas
Pipeline: Activity-level Run Conditions (No IF Container Required)
We need the ability to add a "Run if" condition directly to every pipeline activity. Like, in each acticity's settings. One of the biggest readability issues in Fabric Pipelines is that conditional ...frithjof_v1 day agoCommunity ChampionNew25Views3likes1CommentPipeline: New Routing activity as an improvement to IF and Switch
The current If Condition and Switch activities create large nested containers that own all activities inside their branches. These containers make the canvas much harder to read. Instead, add a lig...frithjof_v1 day agoCommunity ChampionNew13Views1like1CommentEnhance Workspace Throttling to Allow Targeted Limits on Individual Workspaces
a { text-decoration: none; color: #464feb; } tr th, tr td { border: 1px solid #e6e6e6; } tr th { background-color: #f5f5f5; } The current workspace throttling design should be enhanced to allow Fabr...kyleleonard1 day agoNew MemberNew28Views5likes0Comments