When publishing from Power BI Desktop, the pop-up shows a simple list of available workspaces (choose one). The publisher cannot determine which workspaces were published to last, potentially leading to out of date and orphaned dashboards on powerbi.com. Add a few features: 1) Check box beside each workspace (checked means published) 2) Republish the update to multiple workspaces based on checks by cycling through each ...this should be viable as PowerBI already has logic to call out when it's overwriting an existing data set.
10 Comments
- jschlereth21New MemberAlso could be seen as publishing one report to multiple "Groups"...but thanks for posting this idea.
- senarath1New MemberImportant Requirement for integration and consistency
- coconnorNew MemberWe publish a number of dashboards each week and would like to be able to publish them to multiple workspaces simultaneously. We've been experimenting with Microsoft Teams and I've found that even though we all have Pro licenses and dashboards from a private group have been individually shared with other users, then still cannot see those dashboards embedded on a Channel tab. My only guess is that this is because they are not members of the private group workspace we are publishing to. I could create another group and associated Team space, but then I'd have to publish all the dashboards twice and I'd like to avoid that if possible.
- jschlereth21New MemberIt would also be nice for the report to "save" the checks for the workspaces the report was last published to for faster publishing. It would also be nice for the data refresh cycle to be consistent based on this, single report.
- klementssonNew MemberReally needed, another way is to publish to a central store and then create a link in all the workspaces that should see the report.
- fbcideas_migusrNew Membercan the result window that appears following the refresh also indicate to which workspace the refresh was carried out?
- chris158New MemberThis needs to happen. The app architecture is great but it can be tedious to maintain when you have reports that must be maintained in multiple apps.
- teresa_dannaNew MemberYes - we need this yesterday!
- cpanNew Member
I honestly can't believe this feature has not been added yet.
- fbcideas_migusrNew MemberStatus added:Needs Votes
Recent ideas
Conditional Formatting for Column colors and Line colors for Line/column charts
Hi Team, If we could conditionally color the lines and columns in the charts, it would solve a big problem. We can color the forecasted column with different color in the same graph with the help ...Bari2 hours agoAdvocate INew135Views6likes1CommentVertical alignment of data values
Nice addition to word wrap visual titles but... it now causes the data values to not be similarly vertically aligned if one title wraps to three rows and one to two rows. This is more prevalent with...stuartpearson17 hours agoAdvocate IINeeds Votes246Views17likes3CommentsControl Schedule Activation per Environment in Deployment Pipelines
Currently, with the new multiple scheduler feature, we can define multiple run schedules for a Fabric item. However, when using deployment pipelines, there’s no way to control which schedules are act...frithjof_v20 hours agoCommunity ChampionPlanned5.7KViews65likes13CommentsAllow sorting the column axis of a Matrix by its totals (Row Total / Column Grand Total)
Description: In the Matrix visual we can sort the row axis by a measure or total (ascending/descending), and the order updates when slicers change. There is no equivalent for the column axis: col...Leo723 hours agoFrequent VisitorNew4Views0likes0CommentsAllow removing default cell padding in Matrix/Table visuals so images fill the entire cell
Summary Add formatting options to remove the default internal padding of cells in the Matrix and Table visuals (horizontal and vertical), so that images displayed in cells fill the whole cell and ad...ccarpenter1 day agoNew MemberNew50Views2likes2Comments