Hello,
Would it be possible to add parameters to a pipeline run? Sometimes there are parameters such as 'do a full run' vs 'do an incremental run' that we may want to run in different schedules even. However, the current workaround is to wrap these parameterized pipelines in another pipeline and then schedule that one.
This will still respect the 'concurrency = 1' setting, but it feels a bit out of place.
thanks.
3 Comments
- nishalitNew MemberThis work is part of our current Under Reviews
- fbcideas_migusrNew MemberStatus added:Under Review
- JustbobChicoNew MemberDid this ever get completed? The MCP for Azure thinks it is available and the correct way to parameterize a scheduled pipeline
Recent ideas
Pipeline: Activity-level Run Conditions (No IF Container Required)
We need the ability to add a "Run if" condition directly to every pipeline activity. Like, in each acticity's settings. One of the biggest readability issues in Fabric Pipelines is that conditional ...frithjof_v1 hour agoCommunity ChampionNew18Views2likes1CommentPipeline: New Routing activity as an improvement to IF and Switch
The current If Condition and Switch activities create large nested containers that own all activities inside their branches. These containers make the canvas much harder to read. Instead, add a lig...frithjof_v1 hour agoCommunity ChampionNew7Views0likes1CommentDisable Oracle Bundled Provider by Default or Allow Enterprise Administrative Control
Recent versions of Power BI Desktop enable the Oracle Bundled Provider preview feature by default, which can cause Oracle connectivity issues for organizations that rely on custom Oracle authenticati...ASkelt9 hours agoNew MemberNew9Views0likes0CommentsEnhance Workspace Throttling to Allow Targeted Limits on Individual Workspaces
a { text-decoration: none; color: #464feb; } tr th, tr td { border: 1px solid #e6e6e6; } tr th { background-color: #f5f5f5; } The current workspace throttling design should be enhanced to allow Fabr...kyleleonard12 hours agoNew MemberNew28Views5likes0Comments