I have many pipelines built within fabric.
Now I have had IF conditions within these in order to control when the refresh actually activates.
e.g. If the hour is greater that 22 but lower than 7 then fail and do not refresh.
Otherwise refresh data.
In lamen terms. Only refresh in the day.
Recently this logic has failed and the IF condition just get's stuck in a loop of itself.
A simple option would be similar to the power bi dataset schedule refresh but add some options for us similar to the logic above?
No CommentsBe the first to comment
Recent ideas
Data Pipelines - Run only selected activities
For debugging and testing pipeline activities during development, allow us to select one or multiple activities and run only the selected pipeline activities. For example, I'm working on editing ...frithjof_v12 hours agoCommunity ChampionNew616Views11likes2CommentsSemantic model connection bindings should be in source control (Git)
Semantic model data source connection bindings should be source controlled. A semantic model can contain multiple data source references, each of which can be mapped to a separate Fabric data connec...frithjof_v20 hours agoCommunity ChampionNew17Views1like0CommentsBulk changing column names in Visualizations Pane
We often use raw/api column names or measures with a set nomenclature to be consistent and to keep track of them but we do not want to display these names in the visuals. Currently we have to change ...vishal14019723 hours agoFrequent VisitorNew6Views0likes0Comments