It would be great to get the option to pick what parts of the Performance Analyzer results to display.
Often times only the DAX and DirectQuery timings are of interest, other times maybe only the wait times for visual rendering are interesting.
Today one has to manually expand all refreshed visuals and look for the specific duration metric under each visual.
I know we now have the option to export the results so that the filtering could be done outside of Power BI but that would not be needed if filtering was made available directly in the result pane.
No CommentsBe the first to comment
Recent ideas
Data Pipelines - Run only selected activities
For debugging and testing pipeline activities during development, allow us to select one or multiple activities and run only the selected pipeline activities. For example, I'm working on editing ...frithjof_v19 hours agoCommunity ChampionNew618Views11likes2CommentsSemantic model connection bindings should be in source control (Git)
Semantic model data source connection bindings should be source controlled. A semantic model can contain multiple data source references, each of which can be mapped to a separate Fabric data connec...frithjof_v1 day agoCommunity ChampionNew21Views1like0CommentsBulk changing column names in Visualizations Pane
We often use raw/api column names or measures with a set nomenclature to be consistent and to keep track of them but we do not want to display these names in the visuals. Currently we have to change ...vishal1401971 day agoFrequent VisitorNew6Views0likes0Comments