Experimenting with Copy Job. Yeah, OK, but not great. Some suggestions:
1) Make the option for OVERWRITE available for Warehouse destinations. Currently available for Lakehouses only. This article ...
ToddChitt
5 months agoSuper User
Miwa1
Copy Jobs are great for keeping Fabric data stores (lakehouse / warehouse) synchronized from a source system, of which there are many.
I see that TIMESTAMP is now available as an Incremental Column. Great.
Testing it out, I configured my Copy Job to run every 15 minutes. But the run history or schedule do NOT show up in the main Fabric Workspace view, under columns of "Refreshed" and "Next refresh".
Pipeline schedules don't show up there either.
Please add these run tracking properties for ALL objects that can be scheduled.
Recent ideas
API to check that Failure Notifications for Scheduled Pipeline Runs are correctly set up
Please create a GET API endpoint so that we can check whether users have been added to the Failure Notifications list for a scheduled pipeline. Instead of having to check this manually for each pipe...frithjof_v1 hour agoCommunity ChampionNew7Views0likes0Comments:: operator for typecast in T-SQL
Introduce support for the ::type cast operator in Fabric Data Warehouse as syntactic sugar for the existing CAST(... AS type) expression. The new operator would be functionally equivalent and compile...jovanpop-msft11 hours agoMicrosoft EmployeeNew42Views7likes1CommentThis is a genuine feature request for Power BI Table and Matrix visuals.
Problem: Currently, Table and Matrix visuals do not have a built-in "Corner Radius" option in the General format settings. To create rounded corners, we have to use a Shape as a workaround behind th...SBK_MART11 hours agoNew MemberNew2Views0likes0CommentsAdd Corner Radius for Table and Matrix Visuals
Problem: Currently, Table and Matrix visuals do not have a built-in "Corner Radius" option in the General format settings. To create rounded corners, we have to use a Shape as a workaround behind th...SBK_MART12 hours agoNew MemberNew5Views0likes0CommentsPower BI reports with more than 50 report pages cannot be exported
Currently, you can only export those Power BI report where total report pages are less than or equal to 50. If a report has more than 50 pages and you try to export it (PDF/PPT) you get an error mess...ankushsharma113 hours agoNew MemberNeeds Votes5.5KViews331likes51Comments